GBS System (Excel) Version History

Date
Version
Change Details
15-May-16
6.4.0
Minor Update: This release contains a number of bug fixes and enhancements, namely;
1) This version is compatible with Office 2016.
2) Fixed main menu not enabling correctly in Office 2013 x64.
3) Fixed issue with Resource graphs not laying out correctly in Office 2013.
8-Jan-15
6.3.4
Minor Update: This release contains some fixes to minor cosmetic issues with the Debug Analysis Reporter. Also, contains a bug fix for some minor issues with the date formatter in the Gantt build.
26-Jan-14
6.3.3
Minor Update: This release contains another bug fix with Fiscal Quarterly based reports showing incorrect task bars. Also, fixes an issue with Gantt labels not being hidden when tasks are hidden or outline used.
1-Jan-14
6.3.2
Minor Update: This release contains bug fix with Fiscal Quarterly based reports showing incorrect task bars.
7-Apr-13
6.3.1
Minor Update: This release contains bug fix when older legacy .xlsm excel files are opened, a warning is now displayed requesting you to email them to be fixed.
21-Mar-13
6.3.0
Minor Update: This release contains a number of bug fixes and enhancements, namely;
1) This version is compatible with Office 2013.
2) Enhanced the Gantt menu and ribbon to now be always available and added a new command to create a new Gantt workbook. Therefore, as long as the Gantt system has been setup, you can simply create
a new Gantt workbook from either the ribbon or menu.
3) Added option in ‘Configuration’ dialog to control how the menu and ribbon are displayed. This allows for configuration back to pre 6.2 ribbon style of operation. That is, ribbon only visible if Gantt Chart workbook is opened.
4) Fixed issue with loading demonstration data into 2010 and latter version workbooks not building correctly.
5) Fixed issue with licence file not registering correctly with Office 2010 x64 when a licence had already been registered from another non-x64 machine.
6) Fixed an issue with the Gantt ‘Save As’ not working correctly if the save was cancelled.
7) Fixed issue with some Resources functions allowed for non-Plus Pak licences when it should not be.
19-Jan-12
6.2.1
Minor Update: This release contains a number of bug fixes and enhancements, namely;
1) Fixed issue with date repair tool on building gantt chart that contains invalid dates.
2) Fixed issue with dependendies failing to build sometimes in Excel 2003 and earlier.
13-May-11
6.2.0
Minor Update: This release contains a number of bug fixes and enhancements, namely;
1) Fixed issue with Status lines failing in Excel 2010.
2) Added XP style buttons to most Gantt based forms.
3) Added the Office Ribbon to legacy Gantt workbooks from earlier versions of the builder.  That is, even in old Excel 2000 version of Gantt, you will get the rinnon in Excel 2007/2010 now.
4) Fixed Resource Costing builder failing in Excel 2010.
5) Fixed an issue with Single Line Gantt building would fail in Excel 2010.
6) Fixed an issue with ‘Save As’ and ‘Clone Sheet’ where it would produce an error if a graphic item was selected on the Gantt sheet.
7) Improved single line build mode to alos handle other task that are Successor to the one just editied.
8 ) Added the ability to correct with time for string based invalid Gantt dates. This is not  normally seen unless you have invlide Gantt start/finish dates.
9) Fixed an issue with date/time in the Create New Task wizard.
10) Added the ability to adjust the step size on the indetation/outline wizard.
11) Added example pictures on the stacked task wizard.
12) Fixed Export for 64 but version of Excel 2007/2010.
Note –  Excel 97 is no longer support from this version onwards.
7-Apr-11
6.1.3
Minor Update: This release contains a number of bug fixes, namely;
1) Fixed an issue with compile errors on loading the Gantt library in pure 64 bit installations of Office 2010.
2) Fixed ‘SaveAs new Workbook’ not working in 32 bit versions of Excel 2007/2010.
3) Fixed ‘Export to Excel Workbook’ not exporting the graphic region of the Gantt chart in 32 bit versions of Excel 2007/2010.
4) Fixed ‘Clone’ not exporting the graphic region of the Gantt chart in 32 bit versions of Excel 2007/2010.
19-Feb-11
6.1.2
Minor Update: This release contains a number of bug fixes, namely;
1) Added checks for the Start/Finish fields not being valid dates. This can occur sometimes if the dates are copy/pasted from some other external data source. If text based dates are encountered, then a dialog will appear to allow them to be automatically updated to the correct format.
2) Fixed an issue with the maximum number of columns. This was increased for 2007/2010 but if the spreadsheet is an old .xls the old limits still need to apply. To extend to the newer limits, the file needs to be saved as a .xlsm file.
3) Fixed an issue with conditional colour formatting. This would not work in 2007/2010 if a range was set using a formula. The fault was conditional colours would not work if a range of conditions were used.
28-Jun-10
6.1.1
Major Update:  This release contains a number of new functions, Excel 2010 compatibility,  as well as some bug fixes, namely;
1)  Improved how resource graphs are sized and removed the need to manually adjust to suit different printers. This has resulted in no longer needing to manually set the graph size in the Configuration dialog.  Also, improved the way page setup is managed. Now if the user modifies the page setup, such as adding a company logo to the header or changing the footer, these is now preserved between builds.
2)  Extended the maximum chart width from 240 columns to 2000 columns for both Excel 2007 and 2010 versions.
3)  Added the other Gantt sheets to be printed/previewed from the Gantt menu.
4)  Added the ability to control the length of the elbow used in dependencies. This is controlled via the ‘Dependencies’ tab in the ‘Configure’ dialog.
5)  Fixed an issue with outlines generating an error sometimes.
6)  Fixed an issue with Help not working on x64 bit systems.
7)  Fixed an issue with ‘Evaluation’ watermarks on Resource profile graphs.
8 )  Fixed an issue with the right-click menus Add and Delete Gantt Tasks. Sometimes these would not update the task dependencies correctly.
9) Fix up dependency connectors issue for 2007/2010 in Gantt chart. Also, made some improvements to the layout on all versions of Excel.
10) Fixed a number of issues if the Resource Cost sheet was active in Excel 97 version only.
11) Fixed an issue with Resource Costings – Tier 2. If the limit of groups was reached, the total displayed was incorrect, this issue has been fixed.
12) Fixed an issue with toggling the Guidelines/Help on the Resource Cost sheet.
19-Feb-10
6.0.2
Added missing installation file.
27-Jan-10
6.0.1
Major Update:  This release contains a number of new functions as well as some bug fixes, namely;
1) Added baseline capability. Note, this function is only available to Plus Pak version of the software.
2) Added Resource Groups. This new function allows you to define a number of resources into a Group and then produce profile graphs and costing based on these groups.
3) Updated the calendar popup so that is allows hours/minutes to be entered if the display format shows these. Otherwise, behaviour remains unchanged.
4) Enhanced the Outline feature, by adding the capability to automatically indent a user specified column based on the values within the Outline column.
5) Fixed a bug with absolute sized progress bars not drawing in the correct positioned within the Gantt bar.
6) Fixed an issue with labels not working on some recurring tasks.
7) Fixed an issue with auto build causing errors when used on stacked Gantt charts.
8 ) Fixed an issue with dependencies failing with an error message for recurring tasks.
7-Sep-09
5.6.2
Minor Update: This release contains a number of bug fixes, namely;
1) fixes an issue with the Toolbox function ‘Dependency Recalculate’ where it would cause Excel to crash if the Auto Build feature was also enabled. This problem has been resolved in this release.
2) fixes an issue with erroneous errors being reports if the computer did not have any printers installed.
3) fixes an issue with outlining if a value in column A was less than 1.
22-May-09
5.6.1
Minor Update: This release contains an enhanced export functions. Now includes image files (bmp, jpg, and gif) and also Adobe pdf format files.
Also, fixed a number of issues;
1)  fixed watermarks on export as image for evaluation.
2)  fixed watermark on multi page printouts for evaluation copy.
3)  fixed watermarks on export function when large exports performed.
4)  fixed an issue with conditional bar colours not working in Excel 2007.
5)  fixed an issue with continuation markers failing if forced and calculated together.
6)  fixed an issue with text labels displaying incorrectly if they were dates or numbers.
13-Jan-09
5.5.1
Minor Update: This release contains a fixed to an issue with the builder producing an error during the build process incorrectly.
7-Jan-09
5.5.0
Major Update:  This release contains a number of new functions as well as some bug fixes, namely;
1) NEW FEATURE – Added stacked bars functions. This allows for multiple tasks to be displayed on a single Gantt row. Refer to user manual and new demo data for further details.
2) Fixed an issue with the vertical positioning of Gantt bar labels when tasks were not centered in the Excel row.
3) Fixed an issue with the length of the progress bar calculated incorrectly when user defined start/finish dates for the chart are used and the task had portion of it either before or after the chart dates.
4) Fixed an issue with Gantt bars being drawn even if they lay outside the requested user entered build date ranges.
21-Dec-08
5.4.2
Minor Update: This release contains some fixes for Excel 2007 specific issues. Namely; added build version checking for Excel 2007 because of some graphic incompatibilities which caused errors on Export function under certain circumstances. Added a workaround to the Excel 2007 corrupt file issue with .xlsm files after the ‘Demo’ data has been loaded can cause an error after the file has been save and re-opened.
5-Oct-08
5.4.1
Major Update:  This release contains a number of new functions as well as some bug fixes;
1) Made more improvements to hotkeys. In earlier version the hotkeys set would also activate in another workbook. This issue has been resolved.
2)  NEW FEATURE – Added user configurable hot keys via the ‘Configure’ dialog. The user can now setup their own hot keys for any of the Gantt functions.
3) Fixed an issue with resource graphs drifting down the page a little with US Letter paper size and greater than 5 or so resources.
4) Fixed an issue with the library not working in Excel 97. This backward compatibility has been restored.
5) Fixed an issue with licences not expiring correctly. They would need to wait for the next day to release. Now they will expire exactly 7 days after they are acquired.
15-Jun-08
5.3.1
Major Update:  This release contains a number of new functions as well as some bug fixes;
1) NEW FEATURE – Added menu routines to show/hide completed tasks. Also, added configuration item to automatically hide completed tasks when printing.
2) NEW FEATURE –  Added another daily date band that is 12 hourly with 2 bands per 12 hour block.
3) NEW FEATURE – Added a weekly date band that shows the actual day number instead of the day of the week. That is shows 5, 6, 7 etc instead of M, T, W etc.
6) NEW FEATURE – Added hot keys to the Insert/Delete Gantt Tasks and also the Gantt Task Wizard menu items.
5) BUG FIX – Fixed a bug with Auto Build Gantt bars running when the chart was built with Absolute headers such as M1, M2, etc. This is now not permitted.
6) BUG FIX – Improved, slightly the performance of the help function. Also, the system will only search once per Gantt file now instead of once per excel session.
31-May-08
5.2.2
Minor Update: This release contains a fixed to an issue with the “Outlook task export” function when the Gantt column headings contained non-printable characters, this would cause the export to fail.
26-Apr-08
5.2.1
Major Update: This release contains a number of new functions as well as some bug fixes;
1) BUG FIX – Performance improvement on some workbooks with very large column counts. Improved how hidden rows are processed so we now only process the actual hidden rows instead of all of them.
2) BUG FIX – Fixed an issue with building Gantt charts not working correctly, if the user has turned off automatic calculations.
3) NEW FEATURE – During the build process, sometimes a date band will not be available because the date range is too large. This enhancement adds a button on these messages to show how many columns are required to assist in modifying your date ranges.
14-Apr-08
5.1.2
Minor Update: This release contains a fixed to an issue with the main Gantt worksheet being locked for editing when the resource costings was used.
08-Mar-08
5.1.1
Minor Update: This release contains a fixed to an issue with the default settings for page sizes on Letter and Legal paper sizes. Also, added the function ‘Save Gantt Sheet to a new workbook”. This will allow the user to save the current selected Gantt sheet into a new workbook that is fully functional Gantt builder file.
29-Feb-08
5.0.5
Minor Update: This release contains a number of bug fixes; namely fixed an issue with the right-mouse click routines in non-english versions of the Gantt program. Improved error reporting on workbooks that have been damaged by the user, such as removing the inbuilt code routines etc.
10-Feb-08
5.0.4
Major Release: This release contains a number of new functions as well as some bug fixes.
1)  NEW FEATURE – Added resource costs and project cost profiling.
2)  NEW FEATURE – Added feature of a new task wizard that steps through the process of creating a task. This interactive step-by-step planning aid will help you quickly master the project management process and terminology used.
3)  NEW FEATURE – Added the ability, via the configuration dialog on the Task Labels Tab, to define task labels without the need to place text in the righthand most column. The configuration dialog allows you to override this and force labels to be placed based on a specific columns values. Note, if this forced option is selected, then it will override the text in the righthand most column.
4)  Improved error handling for the outline function.
5)  Fixed an display issue with calendar control within the Configure dialog.
6)  Fixed an issue with “GBS Insert Row” and “GBS Delete Row” when the auto build feature was turned on.
7)  Improved resource profiles to take into account recurring task information.
8 )  Fixed an issue with the Gantt right-mouse-click menu still appearing in other workbooks.
9)  Fixed an issue with milestones on Mondays being removed if hide weekends was enabled.
10) Fixed an issue with ‘auto-build’ enabled, tasks with labels would leave the old label behind until a full rebuild of the chart is performed.
1-Jun-07
4.2.0
Minor Update: This release contains a number of new functions as well as some bug fixes, specifically for Excel 2007.
1) Fixed an issue with Excel 2007 not being able to print Gantt charts.
2) Improved error handling on Print and Print Preview functions
3) Fixed an issue with the Roll-up auto population Toolbox not working is ‘S’ tasks where present either just before or just after the ‘R’  marked task.
4) Added Excel 2007 Ribbon bar to Excel 2007 version (.xlsm) of Gantt file.
5) Fixed an issue where the Gantt columns would not be the correct size if the user saved the Gantt workbook in a .xlsm format.
6) Fixed an issue where dependencies would not build correctly under Excel 2007. The issue here was Microsoft had changed the implementation of some of the shape operators.
7) New feature – added 3D Gantt bars for Excel 2007 version.
18-Apr-07
4.1.3
Fixed an issue introduced in version 4.1.1 where an ‘error 13’ would be produced during the Gantt build process for non-english versions of Excel.
13-Apr-07
4.1.2
Fixed an issue where Gantt bars would fail to build if they were recurring tasks and the Auto-Build feature was enabled.
10-Feb-07
4.1.1
Fixed an issue (workaround for Microsoft Excel 2007 bug) where Gantt bars would not align correctly the further down the chart you went.
03-Feb-07
4.1.0
Minor Update: Fixed a number of issues to make this version compatible with Excel 2007. Also, keeps backward compatibility with Excel 97, 2000, XP, and 2003.
01-Sep-06
4.0.1
Fixed an issue where the chart would error during build if AutoFilters were present with criteria. These are now saved and restored after the build is complete.
13-Jun-06
4.0.0
Major Release: This release contains a number of new functions as well as some bug fixes.
1)  Added fiscal based chart types. This allow charts to be build based on fiscal years instead of the normal calendar years. These are setup via the ‘Configuration’ dialog, and go to the ‘Date Settings’ tab.
2) Enhanced the recurring tasks functions to allow users to specify either hourly, daily, weekly, monthly, or yearly intervals.
3) Added ability to export Gantt tasks to Outlook tasks (this is a Plus Pak function).
19-Feb-06
3.3.0
Minor Update: Added two new menu entries to allow users to create a new Gantt sheet within their workbook, or clone the currently active Gantt sheet.
28-Jan-06
3.2.3
Fixed an issue where by an error would be raised when running the Dependency toolbox if the sheet within the workbook had been renamed.
15-Dec-05
3.2.2
Fixed an issue where the Export function would generate an error.
20-Oct-05
3.2.1
Fixed an issue with digital signature damage with Excel 2002/XP SP3.
10-Sep-05
3.2.0
Minor Update: Fixed an issue with multiple sheets of Gantts within the one workbook. The builder would  always build the first sheet not the current selected one. Added the ability to enable/disable the border around the Gantt chart and can also control it’s colour.
31-Jul-05
3.1.4
Fixed a minor issue with the check for additional data not working under some cases. Also, fixed an issue with export failing due to code within the Gantt worksheet.
3-Jun-05
3.1.3
Fixed a build issue with status lines when the chart also had manually entered chart  date ranges. This would cause the status line input dialog to keep reappearing until the system crashed Excel.
19-May-05
3.1.2
Fixed an issue introduced with 3.1.0 where recurring tasks would error during the build. Also, added the ability to remember manually set dates for chart building.
18-May-05
  3.1.1
Fixed an issue introduced with version 3.1.0 where under certain cases a compile error would result.
13-May-05
3.1.0
Major Update:  Added controls to display the PERT and Resource charts after building has completed. Added some performance improvements to PERT chart building. Added Auto-build feature to allow the Gantt tasks to automatically update the bar and dependencies when data is changed on a row-by-row basis.
9-Apr-05
3.0.3
This update contains a number of fixes and minor enhancements, namely:
  • Fixed a minor problem with “Print Preview” where the header rows did not continue on the second and subsequent pages.
  • Fixed an issue with PERT charts not building if absolute (M1, M2 …) date type was specified.
  • Fixed an issue with time phased pert chars without dependencies were not positioned correctly.
  •  Added the ability for the user to control the centering of dependencies in PERT charts this is a cosmetic issue to allow users the move lines incase of overlap for PERT clarify.
30-Mar-05
3.0.1
Major Release: This release contains a number of new functions as well as the introduction of a ‘Plus Pak’ extension for users that require the additional functions. New in this release is:
  • the ability to build PERT charts (Plus Pak only),
  • the ability use specify resources for each task and build resource profile graphs (Plus Pak only),
  • added the ability to collapse/hide Gantt chart detail via Excels outline features.
  • fixed a number of minor issues/bugs and enhancements.
13-Feb-05
2.9.0
Major Update:  Added additional 4 hourly date band to extend total duration of chart to approx 16 days. Added the ability to store the last used status line date for reuse when the chart is  rebuilt. Added Print Preview menu that allows the user to select a specific printer. Added another dependency connection style that is user selectable. The style can be set via the configuration dialog.
30-Oct-04
2.8.3
Fixed an issue with the auto rollup function not working if blank/skip rows are present before the rollup row. Fixed an issue with the auto milestone function not working if blank/skip rows are present.
14-Oct-04
2.8.2
Fixed an issue where the calendar popup would produce an error when used to set the entire chart’s date range during building.
8-Oct-04
2.8.1
Fixed a minor bug related to the positioning of the calendar popup. Sometimes it would not appear at all.
19-Sep-04
2.8.0
Major Update:  Added more functions to the calendar popup and improved some position related issues. Fixed a minor bug when canceling a chart build for the very first time. Fixed an issue with licence scanner in Excel 97.
21-Jul-04
2.7.2
Added an OLE interface to the GBS program. This will allow building of Gantt charts from external programs such as VB. Also, fixed some chart building and export issues if the user has added one or more columns before the default “A” column.
16-Jun-04
2.7.1
Fixed a problem with 2.7.0 not working with non-english versions of Excel. Also, added the ability to scan for licence files if a licence error is detected.
5-Jun-04
2.7.0
Major Update:  Added absolute labeling in the chart header (ie W1, W2, … Wx), added the ability to allow >100% complete tasks, and added the filtering function to zoom in/out of the chart. Also, fixed an issue where conditional fill colour on Column A were not being applied for Milestone and Rollup tasks colour’s. Changed Qtr based charts to be sub-divided into 3 (more intuitive) instead on 4 sub-divisions.
3-Apr-04
2.6.1
Corrected a problem with the ‘Help’ menu entry not working with ‘File not found’ error.
13-Mar-04
2.6.0
Major Update: Added new features to the Rollup Task utility toolbox, such as can an now rebuild existing rollup dates and autocalculate dates based on ‘R’ tasks.
29-Jan-04
2.5.2
Corrected an issue where GBS failed to correctly construct bars for rows that have been hidden by the application of a filter. Corrected an issue with the recurring tasks dialog not allowing values greater than 50.
21-Jan-04
2.5.1
Corrected an issue where GBS failed to correctly construct bars for rows that have been hidden by the application of a Filter or by using the Outline/Group feature.
7-Jan-04
2.5.0
Major Update: Added the capability to have recurring tasks defined and draw multiple Gantt bars on a single row. Also added a right-mouse-click popup for the Task Type column to make setting this field easier.
3-Dec-03
2.4.0
Major Update: Added the ability to re-calculate task dates based on their  dependencies. This is used to automatically move tasks based on their dependencies. Added ability to control the calendar popup default date.
Also, fixed an issue with some non-english language versions of Excel.
21-Nov-03
2.3.3
Fixed an issue introduced into weekly charts with the last update.
20-Nov-03
2.3.2
Fixed issue with auto update failing on pre 2.x versions.
Fixed an issue with charts failing sometimes under some unusual date circumstances.
10-Nov-03
2.3.1
Fixed an issue with the separator line not displaying when both shade & hide weekends are turned on. Fixed an issue with print preview destroying some user set column settings. Fixed a problem with public holiday shading being incorrect sometimes.
17-Sep-03
2.3.0
Major Update: Added the ability to shade and alert on public holidays. Public holidays can now be entered by the ‘Configure’ option on the menu. Also, added a new demo data to illustrate the use of task durations.
11-Sep-03
2.2.1
Correct a problem introduced by the latest update to most antivirus scanners. No functional changes present.
5-Sep-03
2.2.0
Major Update: Fixed an issue with task bars being shadowed if the default setting was shadow on. Fixed an issue if trying to build a chart with ‘object selector’ enabled. Also, fixed the export function not working with dependencies.
Added new function where tasks can now have labels defined for them.
12-Aug-03

 

2.1.3
Fixed an issue with GBS not working correctly under Office . Also, fixed the set date format not working correctly when “Other” format selected.
22-Jul-03
2.1.2
Fixed an issue with the export function not correctly processing comments. Also, fixed an issue with comments being left behind after the build, if they are to the right of the chart.
14-Jul-03
2.1.1
Corrected an issue with the special row insert and delete function not recalculating the dependencies correctly.
3-Jul-03
2.1.0
Major Update: Added the new function to display a Status date line on the chart. Also added a warning message if the chart looks like it may have more data.
14-Jun-03
2.0.9
Added ability to determine, via web, if a newer version is available. Also, added option to submit enhancement requests via the program.
1-May-03
2.0.8
Fixed an issue with hourly date bands failing if the duration of the entire Gantt chart was only single day.
20-Apr-03
2.0.7
Corrects a problem with hourly date bands not constructing.
18-Apr-03
2.0.6
Added the capability to colour the Gantt bars based on Excel’s Conditional Formatting properties. Also, added demonstration data that uses conditional formatting as an example of its use.
18-Mar-03
2.0.4
Corrected an issue introduced with 2.0.2 with the end of tasks not being calculated correctly. Corrected an issue with the date popup when the current value was blank or a non date value for start and finish dates.
07-Mar-03
2.0.2
Major Release: This release contains a fully reworked user interface to remove the toolbars and reduce clutter. Also, major functional changes include:
  • the introduction of task dependencies,
  • greater control over task sizes and positions with each row including constant task heights,
  • introduction of a chart update wizard to simplify future upgrades, and
  • access to the user documentation from within the GBS application.
15-Feb-03
1.9.2
Corrected an issue with Daily by 12 hours charts not calculating correctly. Plus added refinements to all Daily chart types.
30-Jan-03
1.9.0
Major Update: Added the capability to configure the way hours are rounded with Weekly based charts. Also, removed the ability for a user to explicitly release their licence before the 7 days auto expiry period due to abuse.
14-Jan-03
1.8.3
Added further enhancements of the accuracy of Gantt bars when ending very near the end of the date band. Also, added the ability for a user to explicitly release their licence before the 7 days auto expiry period.
08-Jan-03
1.8.2
Fixed and error when the task date ends exactly on the chart end date causes an error under some circumstances and the chart not to build correctly. Corrected an issue with folder names for MAC version. Also corrected an issue in the evaluation version only with the selection of the 5 year band.
23-Dec-02
1.8.0
Major Update: Added 5 year and 10 year date bands. Also improved the resolution and positioning of Gantt bars.
16-Dec-02
1.7.7
Corrected an issue with manual date range setting when the chart is weekly and the last date is exactly on the last day. Issue only present in manual date setting. Expanded the available date ranges for the evaluation version. Corrected an issue with weekly and bi-weekly charts when dates transition over a year boundary. Enhanced the debug analysis reporting wizard.
7-Dec-02
1.7.5
Added capability to allow users to define borders, background fill colours and text colours for the part of the Gantt to the left of the chart. Prior to this version, these properties were cleared. Now, via the configuration dialog, you can set to preserve these properties.
21-Nov-02
1.7.2
Fixed a minor issue with backward compatibility with earlier versions of the user’s base builder file. Fixed a rounding issue with weekly based charts where the hours were being truncated from the date so 2-May-02 8:00am to 3-May-02 6:00pm would only show one day not two.
2-Nov-02
1.7.0
Major Update: Added capability to scale/zoom the Gantt chart during the build process. The zoom factor is controlled via the configuration dialog. Also, made significant refinements to the resolution of the Gantt bars, resulting in more accurate bars.
7-Oct-02
1.6.3
Added debug reporting wizard to facilitate our support staff’s analysis of your problems – this update is a support feature only.
7-Sep-02
1.6.0
Major Update: Added the ability to use fill patterns for Gantt bars as well as colour. This feature is fully configurable via the configuration dialog.
6-Aug-02
1.5.1
Major Update: Added additional “Week By 2 Week” date band and toolbar to control date/time formatting. Added better error handling on non-upgraded versions of .xls file and fixed a modality error with manually setting date ranges. Also, updated the Converter.xls workbook to not be dependent on Microsoft’s MDAC software.
18-Jul-02
1.4.2
Fixed compile issue with Office 97 and improved weekend shading. Performance improvements with some non-english language versions of Excel. Also corrected some right-click erroneous activations on the Gantt sheet.
29-Jun-02
1.4.0
Major Update: Added weekend shade/hide function. Also, added calendar popup on start and finish times.
23-Jun-02
1.3.6
Fixed problem with US date formats.
03-Apr-02
1.3.3
Major Update: Added hourly date bands. Also, fixed a bar layout issue with hourly bands in US date format.
28-Mar-02
1.2.2
Fixed a compatibility problem between Office 97 and XP.
05-Mar-02
1.2.0
Major Update: Corrected a issue with non-english versions of Excel and the use of particular add-ins. Add-ins removed.
01-Mar-01
1.1.5
Fixed a number of minor bugs.
17-Jan-01
1.0.0
Initial version.

                                                                                                                                                                                                                                                                                                           